Skip to content
ROENHU

A road · Neamț · The Bicaz Gorge · Locuri

The Bicaz Gorge: the road the piano wood came down

Almost 56.5 kilometres between Bicaz and Gheorgheni, through the Bicaz Gorge and past Lacu Roșu, along a valley that was moving freight long before there was any asphalt. What went down here, and what comes up today.


Adi Coco·September 12, 2026·12 min·
hero-cheile-bicazului-EN
Straight down: the gorge is a single strip — limestone wall, road, forest. Photo: AdiCoco.com

A road · Neamț · The Bicaz Gorge

Almost 56.5 kilometres between Bicaz and Gheorgheni, through the Bicaz Gorge and past Lacu Roșu, along a valley that was moving freight long before there was any asphalt. What went down here, and what comes up today.

National road 12C entering the narrows of the Bicaz Gorge, limestone walls on both sides and wet asphalt
The entrance to the gorge from the Bicaz side, after rainPhoto: AdiCoco.com

---

In 1929, the priest and archaeologist Constantin Matasă published Călăuza județului Neamț, a guide to Neamț County. In it he gives two distances for the same place. From Piatra Neamț to the Bicaz Gorge it is 54 kilometres by way of Bicazu Ardelean and 150 by way of Tulgheș and Gheorgheni. Then he explains why: "Whoever can walk 7—8 km. may go to the Bicaz Gorge through Bicazul Ardelean; whoever cannot walk, being frail or elderly, had better take the road through Tulgheș-Ghiorghieni." In 1929, then, to reach the gorge from the Moldavian side you still got down from the carriage.

Today the road exists, it is called DN12C, and the official inventory gives it 56.482 kilometres. The detour Matasă recommended is still standing — it is the diversion the authorities signpost whenever the defile closes, along DN15 through Poiana Largului, Borsec and Toplița — and it is almost a hundred kilometres longer. That difference helps explain the pressure on a mountain road with one lane in each direction.

What went down before the asphalt

The valley moved freight before it had a road; it simply moved it downhill, on water. In 1891 and 1892, on the estate of Urmánczy Nándor, who held some 16,000 cadastral yokes of forest there — roughly 9,000 hectares — a log flume was built: it started at Șugău, ran through the Bicăjel gorge, then through the Bicaz Gorge, and carried the timber as far as the Bistrița — from where it continued down the Siret and the Danube to the Black Sea. A wooden trough between 0.80 and 1.60 metres wide, 60–70 centimetres deep, dropping one metre per kilometre.

White limestone massif, almost vertical, above the narrow defile, in evening light
Limestone more than a hundred million years old, folded crooked: the beds on one flank rise more steeply than those on the otherPhoto: AdiCoco.com

A forestry inspector's report from 1897 puts the flume at 49 kilometres; modern sources consider 28 to 30 realistic. At the end of the nineteenth century, more than 100,000 cubic metres of sawn timber left the Giurgeu basin every year, and the flume was one of the ways out. In 1879, in the Gheorgheni district, 125 water-driven sawmills were cutting the wood. The goods were sorted by destination: floorboards went to Romania, sieve frames to Budapest. Resonance wood — the kind pianos are made of — went to Berlin, to Paris and to London. By 1904, when Gencsy Zoltán photographed it, the flume was no longer in use. The valley did have rails before it had asphalt, though: in 1885 a forestry railway was built here for the timber of the Bicaz valley — the first in Moldavia, according to a historian of the estate.

What comes up today

For a century the valley sent its timber down — on water, on rails, then on asphalt — as far as Berlin, Paris and London. Today the goods travel the other way: they come up from Bicaz and stop at the roadside, at the stalls between kilometres 27 and 32.

Along those seven or eight kilometres the road has one lane in each direction and walls a few metres from your wing mirrors. The limit is 30 an hour, and the falling-rocks triangle stands opposite the wooden stalls selling souvenirs. The national park administration has been asking for years that the traders be moved, and a plan to relocate the stalls into standardised units has stayed on paper. At eight in the evening the stalls are shut and almost nothing passes on the wet asphalt.

Closed wooden stall at the roadside, beneath a limestone wall, with road signs on the opposite side
The stalls stand along the road between kilometres 27 and 32. By eight in the evening they are shutPhoto: AdiCoco.com

One of the exposed points is called Șura, at kilometre 31. There, on 10 August 2022, a rock came loose from the slope and struck a tourist on the head as he stood at the stalls. In April 2026 another warning was issued about the risk of falling rocks in the area.

Large limestone overhang above the road, with a wooden stall sheltering beneath it
Under the overhang there is room for one stall and one lane of trafficPhoto: AdiCoco.com

Restrictions on heavy traffic are documented here from at least 2010, when the Harghita authorities set up police checks at Gheorgheni to turn lorries back. In 2022 the park director estimated that "at least a few dozen" heavy vehicles pass through the gorge every day, and said their vibration contributes to loosening the rock. Exactly how many is not known: there is no published traffic figure for this stretch.

The road and the Bicaz river seen from the air, with a blue lorry and a car on the carriageway, between forested slopes
The floor of the defile: the road, the river, and everything that fits between themPhoto: AdiCoco.com

At the end of May 2025, after a retaining wall collapsed into the bed of the Bicaz at kilometre 33+940, the county emergency committee ruled that from 2 June, for thirty days, no vehicle over thirteen tonnes could pass, emergency vehicles excepted. The consolidation works finished on 25 July 2026 and traffic resumed without restrictions.

The riverside lane of DN12C closed off with red-and-white site barriers, asphalt cracked down the middle, forested slopes and a limestone peak in mist
The riverside lane is closed off with site barriers, and the asphalt is cracked down the middle. The photograph is from 25 June 2026; the consolidation finished exactly one month laterPhoto: AdiCoco.com

The signposted detour is the same one: almost a hundred kilometres more. Which is why everything that passes, passes through the gorge. It is not the scenic option; it is the short one.

In another country

Everything that came down here before 1918 set out from another country. The Bicaz Gorge, Lacu Roșu and the villages of the upper valley — Bicazu Ardelean, Bicaz-Chei, Dămuc — belonged to Csík County, in Hungary. The border with the Kingdom of Romania ran downstream, at the entrance to today's Bicaz, where a record from 1867 mentions a customs post at Chisirig. Urmánczy's timber therefore crossed a state frontier to reach the Bistrița.

Limestone wall in golden evening light, the defile in shadow below
The last light catches only the lip of the gorge. Down below it is already eveningPhoto: AdiCoco.com

The post-war border change did not move them into Moldavia straight away either. Csík County became Ciuc County, and the villages stayed in it: in 1938, Bicazul Ardelean was still a commune of Ciuc County, not of Neamț. Between 1940 and 1944, after the Second Vienna Award, the valley passed under Hungarian administration again, and a fortifications company was stationed at Bicazu Ardelean with orders to seal the defile. Near the mouth of the Bicăjel, a bridge begun in those years and left unfinished still stands; it is still called Podul Ungurilor, the Hungarians' Bridge. Only from 1968, when the regions were abolished, has the valley been part of Neamț County.

The road through the gorge, piece by piece

The road was built late and in stages, but nobody quite knows when. The dates circulating in secondary sources say it was a cart track widened around 1905, that the Transylvanian stretch was ready in 1914 and the Moldavian one only in 1937; a Hungarian magazine writes that the hairpins began to be built in 1912, for military purposes.

The tunnel, on the other hand, has a date. The first was cut in 1918 by widening a karst cavity in the massif: 68 metres long, 5.70 wide, 4.10 high — too tight, and without the sightlines motor traffic needs. Today's tunnel is built upstream of it and has a blue plate at the entrance reading 155 metres.

The portal of the tunnel on DN12C, with a blue sign giving its length of 155 metres, protective netting on the slope and a hexagonal concrete wall
The plate at the tunnel entrance. Above it, the netting anchored into the slopePhoto: AdiCoco.com

How long is the Bicaz Gorge

The gorge begins at kilometre 26.5 of the road and ends at 34. The climber Emilian Cristea divided it into four sectors, and his division is still the one used by Bicazu Ardelean town hall: Între chei, Polițele Bardosului, Gâtul Iadului and Sfârșitul cheilor. Gâtul Iadului — the Throat of Hell — runs from kilometre 31 to 32.2 and looks like a canyon; in Hungarian it is called Pokol tornáca, and above the road there leans the rock known as Turnul de Pază, the Watchtower.

How long it is depends on which markers you use. Bicazu Ardelean town hall, counting from 26.5 to 34, arrives at seven and a half kilometres. Bicaz-Chei town hall, next door, writes eight. The climbing guides of Emilian Cristea and Walter Kargel say six. It depends where you decide the gorge begins and where it ends.

The hairpins of national road 12C seen from the air, drawn across the forested slope above the gorge
The only place from which you can see that the road is a construction, not a valley followedPhoto: AdiCoco.com

Piatra Altarului

Above the second sector stands Piatra Altarului, the Altar Stone. The first ascent was made on 8 September 1934 by two men from Brașov, Erwin Csallner and Waldemar Johann Goldschmidt, watched by several hundred people gathered in the valley.

Only Csallner reached the summit that day. Goldschmidt, past forty, stopped on the last ledge and climbed it only the following summer, on 8 July 1935.

Lacu Roșu and the Transylvanian end

The road leaves the limestone at Lacu Roșu, the Red Lake, listed as a resort of local interest. The lake formed in the summer of 1837, when a piece of the slope dammed the valley — some authors also attribute the landslide to the earthquakes of the following winter. The lake's name comes from the mountain, not from the legend of the murdered girl: Orbán Balázs wrote in 1868 that the lake had been named after the mountain above it, and that the mountain bore the name before the lake existed.

Higher up, the road climbs to the Pângărați pass and drops into the Giurgeu basin. Behind it the villages are left. Bicaz-Chei has more than five thousand sheep, which in summer go up above 1,200 metres. Bicazu Ardelean had 4,030 inhabitants at the 2011 census and 3,236 at the 2021 one — almost a fifth gone in a decade.

Bilingual road sign, județul Harghita and Hargita megye, at the edge of DN12C, with a car coming the other way
The county boundary sign, with the name written in Romanian and in HungarianPhoto: AdiCoco.com

Where one county ends and the next begins was litigated here for some fifteen years. In November 2024 the High Court of Cassation and Justice (Înalta Curte de Casație și Justiție) rejected the last extraordinary appeal, and the gorge remained part of Neamț County. The sign that separates the counties stands a few kilometres higher up, next to an electricity pole.

Limestone ridges and misty valleys in evening light, seen from the air above the gorge
From the air the gorge is barely visible: it is the narrow slot between the ridgesPhoto: AdiCoco.com

Down this road came the wood that pianos were made from, in Berlin, in Paris and in London. Everything now sold at its edge came up.

Cyclist with panniers on the rack, on the wet road through the gorge, beneath a limestone tower
On the wet asphalt, at eight in the eveningPhoto: AdiCoco.com

Below, a cyclist with panniers on the rack is climbing through the gorge. He does not get down from the saddle.

Photographs my own, taken with a drone and from road level on the evening of 25 June 2026, between kilometres 26 and 34 of DN12C, in a single outing. The villages discussed in the text are not illustrated — I have no photographs of my own from there. The field observations — the stalls shut in the evening, the 30 limit and the falling-rocks triangle, the consolidation works under way, the tunnel plate, the county sign — come from that outing; the historical, administrative and statistical documentation rests entirely on written sources, listed below. I did not speak to anyone along the road.

---

Where this happened

Map showing Cheile Bicaz
📍 Cheile Bicaz·Bicaz, județul Neamț

46.8154°N · 25.8291°E · Open in Google Maps · Apple Maps · Waze · OSM

Sources

- Constantin Matasă, Călăuza județului Neamț, Cartea Românească, 1929 — the distances and the advice to go on foot

- Lemhényi Pál, Párját ritkító múltbéli műtárgy: a kisbékási faúsztató csatorna — the 1891–1892 log flume, its route, dimensions and export destinations

- Enciclopedia României, vol. II (1938) — the commune of Bicazul Ardelean in Ciuc County

- Enciclopedia României, vol. II (1938) — the districts of Neamț County

- Bicaz-Chei town hall — belonging to the Gheorgheni district of Csík County, then to the Piatra Neamț raion from 1950 and to Neamț County from 1968

- Bicazu Ardelean town hall — part of Austria-Hungary until 1918, and the 1940–1944 occupation

- The town of Bicaz — the customs post at Chisirig, recorded in 1867

- Suba János, Erdély határvédelme 1940–1944 — the fortifications company at Bicazu Ardelean and its orders to seal the defile

- „G.T. Kirileanu" County Library, Neamț — the villages of the Bicaz valley under Hungarian administration between 1940 and 1944

- Bicazu Ardelean town hall — the division of the Bicaz Gorge into four sectors, with kilometre positions, after Emilian Cristea

- Emanuel Bălan, the forestry railways of the Neamț area, after Radu Belu, Istoria ilustrată a căilor ferate forestiere din România (2007)

- Wild Ferenc, climbing guide to the Bicaz Gorge — the first ascent of Piatra Altarului, 8 September 1934

- Ziar Harghita — Podul Ungurilor, a bridge begun in the 1940s and left unfinished

- Bicaz-Chei town hall — the length of the gorge, the altitudes of its landmarks and the sheep numbers

- Revista Construcțiilor — the Lacul Roșu tunnel on DN 12C: the dimensions of the 1918 tunnel and of the present one

- Ladányi László, A Gyilkos-tó és a Békás-szoros, Természet Világa, October 2016 — the sectors of the defile and the hypotheses on how the lake formed

- Orbán Balázs, A Székelyföld leírása (1868) — the origin of the name of Lacu Roșu

- Government Decision 852/2008 — the list of localities certified as tourist resorts

- Radio România Târgu Mureș, August 2010 — police checks at Gheorgheni for lorries ignoring the tonnage restriction

- Ziarul Atitudinea de Neamț, August 2022 — the park director's estimate of heavy vehicles in the gorge, and the request to move the traders

- Mesagerul de Neamț, February 2025 — the stalls between kilometres 27 and 32 and the relocation plan

- AGERPRES, April 2026 — warning about the risk of falling rocks in the Bicaz Gorge area

- Radio Iași, May 2025 — the restriction on vehicles over thirteen tonnes from 2 June, and the detour route

- Monitorul de Roman, May 2025 — the retaining wall that collapsed at kilometre 33+940

- BZI, July 2026 — the consolidation works completed on 25 July and traffic resumed without restrictions

- Neamț Prefect's Office — the 2024 ruling in the boundary dispute between Neamț and Harghita

- Ziarul Stiri-Neamț — the 2021 census figures for the localities of Neamț County

Newsletter

If you like what you're reading, subscribe.

New articles in your inbox. At most twice a month. No ads.

AC

Fotoreporter

Adi Coco

Adi Coco este fotograf, fotoreporter, specialist în comunicare și membru FEP (Federation of European Photographers)